
Tar and chip is laid hot and needs dry conditions, so timing matters more than for some surfaces.
Late spring through early autumn is ideal. Warm ground helps the bitumen bond and the chippings bed in properly, which means fewer loose chips and a longer-lasting finish.
Cold, wet ground stops the binder gripping as it should. It can still be done in milder winter spells, but a good installer will wait for a dry window rather than rush it.
The good months are the busy months, so it pays to get your quote in early and book a slot. The job itself is usually just a day.
Thinking about this year? Get a free quote and get booked in.